Monday, June 2, 2014

Avion vinyl floor replacement

Finally got brave and cut out the new flooring....the first piece goes in the bathroom thru the berth area hall.



I'm pretty pleased with the fit - almost too close to the wall in places since I'll probably need a little "wiggle room"




And then the final piece for the remainder of the trailer was cut.




And here it is all in place now, no adhesive yet.



Removed all of the vinyl for the final step....using floor leveler to make sure there is a smooth surface for the flooring install!  It has to dry overnight....


2 comments:

  1. It looks perfect...of course!

    Love,

    T

    ReplyDelete
  2. Nice post with great tips. Hope that we will found more helpful post like above from you soon. Thanks.
    Vinyl Flooring

    ReplyDelete