Monday, January 30, 2017

Maiden voyage!!! 3 years in the making!

I'm so thrilled, I just had to post again today! 

Here's the "before" photo from February, 2014:







Duane finished installing the brake controller - so it was time to take the Avion out to calibrate the controller. 

Amazing - we parked the Avion almost exactly 3 years ago in it's spot in the hangar.  (I will admit that we didn't do much on the trailer during 2015...busy sailing....)

Other than jacking it up and down, it hasn't moved all that time.  It's been a long process - but we're intimately  familiar with the entire trailer now!!




We made sure everything inside was stowed properly -  and Duane attached all the towing "bits".  





Buttoned up and ready to go!!





Just a little 10 mile local loop - brake controller worked well - everything behaved as expected....even blew a little dust off!  




 It was too chilly today to wash it - but tomorrow may be much warmer.  Will be nice to pull it back out and wash off all the "hangar grime".   

We have a "short list" of things to finish before we can take it out camping!


Roof seal finished!

Pretty much finished up on the roof!!

We had replaced all 3 of the old plumbing roof vents - and applied copious amounts of Dicor self-leveling sealant to make sure there are NO leaks!!




Everything all tidy - just have to remove our "walking boards".  Glad to be off the roof!!   We may go back up sometime to put solar panels on.  We'll save that for a bit later when we have some camping experience and decide exactly what we need.  Bye-bye roof - won't miss you!!


Sunday, January 29, 2017

Window shade repair

The shade for the rear window appears to be original to the trailer from 1973. It's necessary since the sheer curtains let lots of light in - but they give almost no privacy.

The part of the shade that was exposed for years is crumpled and discolored.



I did a preliminary amount of shopping and it's clear that shades are no longer a popular window covering!!  


Fortunately, the blind is about 5 times longer than it needs to be for the short window.   So, I decided to simply cut it and modify it to use the existing "pull".



I just made a pocket with the sewing machine for the existing pull board.




I was worried that the plastic would tear, but it sewed very nicely!





And it worked perfectly - cost - almost nothing!!


Saturday, January 28, 2017

Rear window

We're finally to the point that we could re-install the rear window...

Remember what it looked like originally -




If you remember, I took it all apart, ordered new tempered glass panes, and reglazed it.  Then we tucked it away because we had work we needed to complete first before re-installation.



Now that all the plumbing and countertop work is complete, it's time to button it up!!  With new sealant and a little muscle...good as new!



Interior shot before adding the curtains.



The sheers re-installed.  There is also a rollup shade behind the shears for privacy.



All done!!


Friday, January 27, 2017

Propane bottle covers

We're getting closer to being able to finally pull the trailer out of the hangar!!  Since we went to all the expense of replacing all the hoses/regulator/etc for the propane gas tanks, I thought it would be good to protect them from the elements.



I tried to find a "hard shell" cover - but ours are the larger 40lb tanks and I couldn't find one to fit.  They make the hard shell ones for 20 and 30 lb tanks, but not 40 lb.  

All I could find was the pull-over vinyl one.  It will do the trick....I'm not terribly pleased with the look right now, but hopefully it will smooth out once its out in the sun. 


Wednesday, January 25, 2017

Bathroom plumbing complete

Finally wrapping up the bathroom refurb.....

We glued the Corian countertop down.   Then Duane installed all the drain/water supply plumbing for our new sink and faucet.

Here's the "before" photo -






Lookin' good!!!




Saturday, January 21, 2017

Entrance door molding

The entrance door molding was brittle, discolored and cracked.  So, I pried it all off - since it was brittle, it came off pretty easily.




After much searching on the internet, I found some almost identical molding.  It's flexible vinyl with a metal interior that "grips" the metal of the doorway.




And there you have it - a nice, white/clean doorway trim!



Friday, January 20, 2017

Plumbing!!

Getting lots done lately!!!

Several of the original copper water lines had frozen and busted.  That's strange because when we drained the lines, they had been winterized with that pink RV antifreeze.  Oh well, it didn't work!!

Duane did some replacement with PEX instead of copper.




We had earlier rebuilt the water pump.  It works great and we understand from some research online that they are great pumps.  He replaced the flexible supply lines also since the original ones were brittle and suspect.




And....drumroll......we have water!!  Love my new kitchen faucet!


Thursday, January 19, 2017

New electrical service

We've had the trailer plugged into a long extension cord all this time.  Not ideal, but it let us run the lights, etc. 

Since the trailer will likely be parked in the hangar every winter, we thought it would be good to have a more "permanent" electrical solution!

(This is mostly Duane's handywork, of course. I just handed him stuff....)

New small panel right next to the trailer.




Duane ran conduit all the way across the hangar to the main electrical panel.



Then we measured out 4 pieces of wire - about 120' each to pull thru the conduit.



Kindof hard to see, but the 4 wires pulled pretty easy thru the long and curvy conduit!



Panel finished!


And trailer plugged in!!  (I've actually ordered a brand new beefy cord since this one is original and a bit "tired" looking).


Wednesday, January 18, 2017

Awing!

Finally tried out the awning - just to see how it sets up and hangs.

Pretty pleased with it - but it is heavy!  Will be a nice, big outdoor shelter.  Total cost - about $200 including the poles.  (And a good bit of labor on my part, of course!)



Monday, January 16, 2017

Entrance Step

The fold-up entrance step needed some attention.  Long ago, I had removed as much rust as I could and primed/painted it with RustOleum.  But the silver color just didn't look quite right.



Re-painted it black.





And glued the original heavy rubber Avion mat back in place.  One more little thing finished!



Saturday, January 14, 2017

Roof work

Today I sealed all the roof seams with EternaBond tape.  It's billed as "permanent and impenetrable". 

Cool stuff - some of the stickiest stuff I've ever used.  Luckily, it comes with a "backing" that allows you to position it right before you peel the backing away.  I've covered all the seams, so we should never have to worry about a leak from the roof again!





 (The boards are there to spread our weight around and not crush the aluminum roof).   Getting closer to being finished up there!!  Just have to install the three new vent covers and finish sealing around the vent fans.  I can't wait to be done up there since I REALLY don't like being up there!




Saturday, January 7, 2017

Propane Tanks

The nice aluminum propane tanks that were original to the trailer were in good shape, but valves and all the "plumbing" was in dire need of replacement.

Duane ordered everything new, except the actual tanks.  

We're required to have a DOT inspection/certification every 5 years.....got that done at a local gas company.



And they're just about ready to power the stove and hot water heater!


Friday, January 6, 2017

More this and that

More "little" things getting accomplished.  Probably won't work in the hangar over the next several days since they're forecasting snow and ZERO degree temps!

Finally got around to the final touch on the awning - installing the brass grommets for the awning support poles.




 And working a bit on the two roof vent covers - they needed new weatherstripping to prevent leakage.




And one of them was cracked on the edges.  We put "EternaTape" over the cracks.  That is the toughest tape I believe I've ever seen!!  I'll paint the entire cap to give it some UV resistance since they appear to be original to the camper - so they've been out in the sun since 1973!!!


Tuesday, January 3, 2017

New belly pan

Remember, this is what the "belly pan" looked like - terribly corroded and multiple holes....



Now the belly is all nice and new - reinstalled the levelers and the propane gas piping.