Wednesday, May 14, 2014

Just a little work

Life seems to be getting in the way of the Avion lately!!! 

We have picked out flooring - since we're pretty close to needing the floor in place so that we can start re-installing the cabinets/toilet/etc.   We've decided to go with a resilient  plank flooring since it's lightweight and appears to be extremely durable.

It's a dark bamboo pattern - looks really neat in place (just from the sample I've got).  Will be delivered next week.  Here's what a single plank looks like:


Other than that, lots of little repairs - most not worthy of notice, but they each take lots of time!

One that I'm halfway thru is replacing the wall cabinet that sits behind the toilet.  It had some water damage - so we're just replacing it all with new boards, using the existing one as a pattern.



1 comment:

  1. The floor looks like it will be perfect...and I'm sure the 'new' cabinet will be too!

    Love,

    T

    ReplyDelete